2011-Present: Telstra work

  • Site surveys
  • Install complete 1800 MHz systems on Ericsson LTE project for Telstra: panel antennas, Hybriflex cables, RRU’s, filters, TMA’s, tails, feeders (LCF 4-50; LCF/UCF 5-50, 6-50, 7-50), connectors, RET cables, earth kits, earthing cable, etc. Installation on poles, towers and rooftops
  • Install complete 2100 MHz system for Telstra: panel antennas, Hybriflex cables, RRU’s, TMA’s, tails, feeders (LCF 4-50; LCF/UCF 5-50, 6-50, 7-50), connectors, RET cables, earth kits, earthing cable etc. Installation on poles, towers and rooftops
  • Install complete 850 MHz system for Telstra: panel antennas, feeders (LCF 4-50; LCF/UCF 5-50, 6-50, 7-50), TMA’s, tails, RET cables, connectors, earth kits, 35mm earthing cable etc. Installation on poles, towers and rooftops
  • Install antenna and RRU mounts. Install new or swap out existing head frame
  • Swap out existing antennas with new
  • Sweep and PIM testing existing and new systems
  • Swap out or install new M/W systems on Ericsson Catalina/Phoenix project for Vodafone
  • Recover filters from LTE sites on Ericsson LTE project
  • Investigate and rectify faults on Telstra Mobiles sites
  • The work was performed working at heights using different techniques: specific climbing techniques, twin rope, working from EWP’s or man cage
  • Provide Handover documents

March 2013 – June 2014: GE/FMG work

  • Install internal equipment and cabling
  • Install MW systems (5.8MHz) on poles and towers along the railway
  • Install Yaggi antennas (500-900MHz) on poles and towers along the railway
  • Sweep testing of new installation
  • Investigate and rectify faults on the above
  • Audit the above sites

2013 – Present: eJV work

  • Survey sites
  • Install new steel work
  • Swapp out old head frames and antennas
  • Swap out old antennas with new
  • Install complete systems for 700/850/900/1800/2100/2300 Mhz, including feeders, combiners, MHAs, jumpers, antennas, breakout boxes, RRUs
  • Install new feeders and hybrid cables of different sizes: 1⁄2”, 7/8”, 1 1⁄4”, 1 5/8”
  • Sweep testing, call testing and fibre testing
  • Investigate and rectifying faults on Optus or Vodafone Mobiles
  • Complete handover documents and supplying them on time

March-Present: Nokia/Optus work

  • Site surveys
  • Install Nokia 1800/2100/2300 RRU’s
  • Install commission and integrate Nokia indoor BTS: 900/1800/2100/2300 Mhz
  • Install GPS for 2300 BTS sync